Laserfiche WebLink
A dozer is used to raise the tarp in the air and then two laborers unroll and <br /> position the tarp. The current tarp size is approximately 65 feet square feet. The <br /> tar (s) is (are) anchored alongthe edges and across the center. The ADC will be <br /> removed the following; morning in the same manner and stored away from the <br /> active face. The same number of staff are utilized to remove the tarp. A dozer <br /> is used to hold the tarp in place and two laborers then re-roll the tarp. <br /> The tarp will be removed within 24 hours and the exposed waste will either be <br /> covered with new waste or with approved cover materials. <br /> Securing the Synthetic Tarp. The tarp will be secured with either soil, sandbags, <br /> tires or other heavy items, which have no sharp edges. Depending on site <br /> conditions tires, sandbags, or other similar items will be placed in a grid pattern <br /> over each panel and aloes the overlap between panels to prevent movement or <br /> uplifting. Walking over the material will be minimized to limit potential damage <br /> to the cover. The area will be inspected to make sure that refuse is completely <br /> covered. Soil will be used for any areas beyond the limits of the tarp. <br /> Remova/ofthe S nthetic Tarp. At the start of each operating day, the cover will <br /> be inspected for signs of damage that might have occurred during the night. Any <br /> damage or excessive wear will be reported to the Site Manager and appropriate <br /> repairs made in accordance with the manufacturer's specifications and <br /> procedures. Tires, sandbags, ander other items used to secure the material will <br /> be removed and stored nearby for later use at the end of the day. If soil is used <br /> to secure the edges, it will be carefully removed to prevent damage to the cover. <br /> Laborers will be instructed to take care when removing, the fabric so as not to <br /> remove any waste material with the tarp. <br /> If the synthetic tarp ADC shows extreme wear or is damaged beyond repair, it <br /> will be disposed of, and a new stock of material used. The panels made of <br /> synthetic woven fiber should last more than six months with proper care and <br /> usage. <br /> 4-1 <br /> Three staff are uilred4e-plaee-t e4afps,--A-leadeFis-used — raise the <br /> tarp in the aiF and then twe laborers URFell and Position the tarp. The tarp is <br /> ears ef-its-origipal-p'e cement.. T.. es+af. aye re"i-ed-te <br /> remeve the tarp. A dezer is used te held the tarp in plaee and twe labeFers thell <br /> -ximate"154eet-squaFe-feet. <br /> Forward Landfill JTD 6-10 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\JTD Rev Sec 6 080105.doc:5/22/02 <br /> Rev.1:7/2002:Rev.2:4/2003;Rev 3:6/2003 <br /> Amendment No. 1:8/1/2005 <br />