Laserfiche WebLink
Landfill permit plus six days at 6,680 tens/day for the existing FeFwaFd Landfill <br /> 4.3.2 TRAFFIC LIMITATIONS <br /> permed traffic= tethe-s+te—Forward will maintain records of incoming loads and <br /> vehicle counts and will limit deliveries of wastes for disposal and other materials <br /> for beneficial reuse to a total of 620 trips/day and to the maximum inflow rates <br /> described above. It should be noted that delivery of waste and other materials <br /> varies on a daily basis. Therefore, on days when less waste is received the site can <br /> accept more loads of the beneficial reuse materials. The existing FE)r•• aFd La <br /> Read Landfall has ne permitted limit but typiEally has 185 ene way vehiele tFiPS. <br /> 4.4 WASTE INFLOW RATES <br /> For the purpose of estimating remaining site life, Tthe eted estimated annual <br /> inflow rate to the ed-Forward Landfill over the next five years is estimated <br /> to be approximately 1,728,-864-_1,871,374 tons, which corresponds to a weekly <br /> average inflow rate of approximately 33, 56,35,889 tons, seven days a week. <br /> Actual quantities received may vary from these amounts. The diminishing landfill <br /> capacity for the Forward Landfill is included on Table 8. <br /> 4.5 REFUSE TO COVER RATIO <br /> The Forward Landfill remaining capacity and associated site life are dependent <br /> on a number of factors. One of these factors is the refuse-to-cover ratio. <br /> Depending on the type of cover material utilized the refuse-to-cover ratio can <br /> vary. The Forward Landfill refuse-to-soil cover ratio is 4:1 (refuse to cover). This <br /> ratio can be achieved with diligent adherence to established operational <br /> procedures. However, Forward Inc. may also accept a number of other <br /> materials which are used as alternative daily cover including, but not limited to, <br /> construction and demolition waste treated auto shredder residue ash and <br /> cement kiln dust, shredded tires, compost materials (off spec-delivered by <br /> generator), processed green materials (PGM), and contaminated soils. <br /> Forward Landfill JTD 4-10 <br /> J:\Allied\Forward\JTD Amendment\Final JTD Amendment\JTD Rev Sec 4 080105.doc:05/24/02 <br /> Amendment No. 1: 8/1/2005 <br />