Laserfiche WebLink
Due to the use of these various materials and their ability to cover the received <br /> waste different refuse-to-cover ratios are applicable to meet performance <br /> standards equivalent to that soil cover. For purposes of this JTD the following <br /> refuse-to-cover ratios will be established and Forward Inc. will monitor <br /> operations to achieve these ratios: <br /> Soil with Tars 6:1 <br /> Clean and Contaminated Soil 4:1 <br /> Shredded Tires 4:1 <br /> PGM 2.5:1 <br /> Com ostable Material 2.5:1 <br /> Treated Auto Shredder Residue 2.5:1 <br /> C&D Inert Material 2.5:1 <br /> Ash and Cement Kiln Dust 2.5:1 <br /> Predominately Forward Inc. utilizes soil (both clean and contaminated), PGM <br /> and TASR Based on the refuse to cover ratios listed above Forward Inc. will use <br /> an effective refuse-to-cover ratio of 4:1 for purposes of calculating the landfill's <br /> remaining capacity and site life. In addition, the remaining waste capacity and <br /> site life are reviewed annually by Forward Inc. and are required to be updated in <br /> accordance with 27 CCR, Section 21640, in conjunction with a review of the <br /> solid waste facilities permit every five years. <br /> 4.56 SITE CAPACITY <br /> As previously discussed, the disposal area footprint consists of approximately <br /> 387.8 acres. The total site capacity is based on the difference between the <br /> estimated subgrade excavation and the final disposal area contours. The total <br /> remaining airspace for the Forward Landfill, as of}artFebruary 29992005, is <br /> 51,040,00032,338,460 cy. Appendix C presents information regarding air space, <br /> final, intermediate and daily cover requirements and remaining refuse capacity. <br /> The remaining ea-p site life is projected to fnid june 2002 when ,ti„ <br /> based on a refuse to soil volume ratio of 64:1 and <br /> a refuse density of 1,740 pounds per cy). The site capacity calculations <br /> reflecting this information are included in Appendix C. <br /> Forward Landfill JTD 4-11 <br /> J:\Allied\ForwardUTD Amendment\final JTD Amendment\JTD Rev Sec 4 080105.doc:05/24/02 <br /> Amendment No. 1: 8/1/2005 <br />