On the basis of the soil conditions modeled, soils suitable for use in the FSL closure final <br /> cover can be generated by select excavation of soils from the proposed borrow source <br /> adjacent to the site. In order to generate adequate performance characteristics, the final <br /> cover materials should be mixed to exhibit a grain size distribution that generally <br /> excludes particles in excess of 3 inches. In addition, soil excavation and placement <br /> operations should be conducted so as to yield a minimum fines content(%by weight <br /> passing the No. 200 sieve) of 70, a minimum of at least 30% finer than 5-microns and an <br /> as-built saturated hydraulic conductivity of less than 1x10-6 cm/s. <br /> As indicated above, sufficient borrow materials are likely to be available from the borrow <br /> source to meet the project specifications (Figure 1). A quality assurance plan describing <br /> the materials testing methods and procedures, testing frequencies, and materials <br /> specifications for an alternative final cover system placed over the FSL is presented as <br /> Appendix D. Moisture monitoring should be conducted in accordance with the <br /> recommendations presented in the monitoring workplan (Appendix E). <br /> 7.0 CONCLUSION <br /> Based on the data presented herein, it is concluded that a 4-foot thick monolithic final <br /> cover section constructed as described above will satisfy the regulatory requirements for <br /> an alternative final cover as defined in CCR Title 27. More specifically, the conditions <br /> summarized above are believed to effectively demonstrate that a prescriptive cover is not <br /> feasible at this site and that the proposed alternative final cover will provide equivalent <br /> protection against water quality impairment at a reduced cost. <br /> 8.0 CLOSURE <br /> This report is based on the project as described and the geotechnical data obtained in this <br /> study. Our firm should be notified of any pertinent change in the project plans or if <br /> conditions are found that differ from those described in this report, since this may require <br /> a revaluation. This report has not been prepared for use by parties or projects other than <br /> those named or described above. It may not contain sufficient information for other <br /> parties or other purposes. <br /> This report has been prepared in accordance with generally accepted geotechnical <br /> practices and makes no other warranties, either express or implied, as to the professional <br /> advise or data included in it. <br /> Geologic Associates <br /> Gl <br /> ?Luis A, Mcanscal Gary L. Lass, RG, EG, HG <br /> Staff Engineer, EIT President <br /> LAM/GLL/lkl <br /> -12- <br /> C:\2005-0082\FOR WARD/ForwardCOVER.DOC\7/t.U2005 <br /> Geologic Associates <br />