My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1 PROJECT DIRECTOR/PROJECT MANAGER <br /> The Project Director/Project Manager shall have overall authority for all CQA activities. <br /> 3.2 CONSTRUCTION MANAGER <br /> The Construction Manager will serve as the Project Director's on-site representative. All CQA <br /> functions will be under his direct authority. All coordination,reporting and issues related to non- <br /> compliance will be directed through the Construction Manager. In addition,he will participate <br /> with the Engineer and Geotechnical CQA Consultant in all decisions related to design issues <br /> which arise during the course of construction. <br /> 3.3 LANDFILL ENGINEER <br /> The Landfill Engineer will be responsible for reviewing all design issues which may arise during <br /> construction. The approval of the Landfill Engineer will be required prior to any design changes. <br /> 3.4 GEOTECHNICAL CQA CONSULTANT <br /> The Geotechnical CQA Consultant will be responsible for reviewing all earth material or <br /> geosynthetic material issues which may arise during construction. Geotechnical consultant <br /> approval will be required for any earth or geosynthetic material modifications or for any design <br /> modifications which may impact the performance of the final cover. <br /> 3.5 CQA OFFICER <br /> The CQA Officer will be a representative of the Geotechnical CQA Consultant and shall be <br /> responsible for overall review, observation, sampling and testing activities for construction. <br /> Specific duties of the CQA Officer include: <br /> C Review of all designs, Project Drawings and Specifications. <br /> e Implementation of the CQA Plan including: assignment and management of all CQA <br /> personnel; review of all field reports; and engineering review of all CQA related issues. <br /> Review of all design changes. <br /> Familiarization of all CQA Monitors with the site and the CQA requirements for the project. <br /> Attendance at CQA related meetings, (i.e. preconstruction, progress and special meetings) as <br /> required. <br /> Participation in the preparation of Record Drawings. <br /> -5- <br /> GLA/2005-0082/FOR WARD/CQAPLAN.doen/15/2005 <br /> GeoLogic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.