L. The minimum compaction for all fill materials placed is specified as 90 percent of the <br /> maximum dry density as determined by ASTM D1557 and the specified moisture content is <br /> 2% above or below optimum moisture content as determined by ASTM D1557. <br /> M. The maximum hydraulic conductivity of the fill materials is specified as 1.0x10-6 cm/sec as <br /> determined by ASTM D5084 or modified USBR E 9600. <br /> N. The Contractor shall selectively excavate soils from pre-approved off-site or on-site borrow <br /> sources as identified by the Landfill Engineer and Geotechnical CQA Consultant(or his <br /> representative) during the grading operations. The cover soils shall contain sufficient fine- <br /> grained constituents such that gravel size and larger fragments do not cluster during <br /> construction. All import soils shall be free of potentially hazardous environmental pollutants. <br /> O. In the designated processing areas, cover soils shall be processed to obtain a uniform soil <br /> condition. <br /> P. Protective cover soils shall be moisture conditioned (or dried) as necessary to 2% above or <br /> below optimum moisture content as determined by ASTM D1557. <br /> Q. Neither material import nor cover production shall exceed the capability of the processing <br /> operation to meet the project specifications. <br /> R. Representative samples of fill materials will be tested in the laboratory in order to determine <br /> the physical characteristics of the material. During processing and/or grading operations, no <br /> soils or soil types other than those previously analyzed may be used,unless the Geotechnical <br /> CQA Consultant documents the suitability of these soils with appropriate additional testing <br /> paid for by the Contractor. <br /> S. Where tests indicate the moisture content, density, saturated hydraulic conductivity, and/or <br /> other required soils characteristics of any fill or portion thereof is below the project <br /> requirements, the particular layer or portion shall be retested and if necessary reworked <br /> and/or removed and replaced until the required condition has been attained. No additional <br /> fill shall be placed over an area until the last fill has been tested horizontally and vertically <br /> and meets the requirements of this document to the satisfaction of the Geotechnical CQA <br /> Consultant. <br /> T. Where work is interrupted by heavy rains, fill operations shall not be resumed until <br /> observations and field tests by the Geotechnical CQA Consultant indicate the moisture <br /> content and density of the in-place fills and/or materials intended for placement are within the <br /> limits previously specified in(P). <br /> U. Drainage provisions shall be constructed in compliance with the recommendations of the <br /> Design Engineer and as shown on the Project Drawings. <br /> -11- <br /> GLA/2005-0082/FOR WARD/CQAPLAN.d oc/7/15/2005 <br /> Geologic Associates <br />