My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:49:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be standard of practice grading machinery of known specifications suitable for <br /> performing the required work in a timely and efficient manner. <br /> C. All material considered by the Geotechnical CQA Consultant to be unsuitable for use in the <br /> construction of the alternative final cover improvements shall be removed. <br /> D. All clearing, grubbing, stripping and site preparation for the project shall be accomplished to <br /> the satisfaction of the Geotechnical CQA Consultant and the Construction Manager. <br /> E. Material deemed unlikely to meet the performance specifications and not disposed of during <br /> clearing and grubbing or demolition shall be removed from the construction area as directed <br /> by the Construction Manager. <br /> F. The ground surface to receive fill shall be prepared(cleared, grubbed or stripped)to the <br /> satisfaction of the Geotechnical CQA Consultant and the Construction Manager and the fill <br /> shall be placed, spread, mixed, watered and compacted in accordance with the project <br /> specifications and as recommended by the Geotechnical CQA Consultant. <br /> G. The ground surface prepared to receive fill shall be scarified, disced or bladed until it is <br /> uniform and free from uneven features which may prevent uniform compaction. The <br /> scarified ground surface shall then be brought to approximately optimum moisture content, <br /> mixed as required, and compacted to a minimum of 90 percent of the maximum dry density <br /> as determined by ASTM D1557. If the scarified zone is greater than 12 inches in depth, the <br /> excess shall be removed and placed in lifts of six to eight inches in thickness. Prior to fill <br /> placement, the ground surface to receive fill shall be inspected by the Geotechnical CQA <br /> Consultant. <br /> H. Irreducible rock or rock fragments in excess of three(3) inches in maximum dimension shall <br /> not be utilized for the alternative final cover improvements. <br /> I. Suitable and sufficient processing and compaction equipment shall be on the job site to <br /> handle the amount of fill being stockpiled, processed,mixed and/or placed. If necessary, <br /> excavation or import equipment will be shut down temporarily in order to allow time for <br /> ,proper preparation and/or compaction of fills. Sufficient watering apparatus will be provided <br /> with due consideration to the type of fill material, curing characteristics,rate of placement, <br /> and time of year. <br /> J. All materials incorporated as part of compacted fill must be inspected and placement must be <br /> observed by the Geotechnical CQA Consultant or their representative. <br /> K. Fill material shall be placed in thin lifts with a maximum uncompacted thickness of six to <br /> eight inches. Each layer shall be spread evenly and thoroughly mixed to obtain a near <br /> uniform condition in each layer. In areas of excess lift thickness, regrading of the surface to <br /> the maximum lift thickness will be completed prior to construction of additional lifts. <br /> -10- <br /> GLA/2005-0082/FOR WARD/CQAPLAN.doc/7/15/2005 <br /> Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.