Laserfiche WebLink
2.4.2 CQA Personnel <br /> CQA inspection was primarily the responsibility of EMCON and on-site CQA monitoring <br /> and documentation was provided by: <br /> • Regina Bussard EMCON Geologist/CQA monitor <br /> • Jerome Jimenez EMCON Engineer/CQA monitor <br /> Engineering assistance was provided on request, by: <br /> • Scott Angus BAS Project Manager <br /> • Andrew Wang EMCON Project Manager <br /> 2.4.3 CQA Documentation <br /> County well drilling permits and State of California Well Completion Reports were to be <br /> completed by TRG. Boring and construction logs for perimeter LFG extraction well and <br /> monitoring probe drilling and construction were prepared by EMCON CQA monitors and <br /> are provided in Appendix A. EMCON's CQA activities are summarized in daily reports <br /> contained in Appendix B. These reports address both routine and non-routine issues, <br /> problems,and solutions. <br /> Construction staking surveys,record surveys, and record drawings were prepared by BAS <br /> and will be included in Appendix C,upon completion. <br /> EMCON/OWT <br /> N:\_landfil\AWI Austin Road-Forward\2004 SVE CQA\text\report\CQA report final.doc Rev.0,1/6/05 <br /> 2-4 <br />