Laserfiche WebLink
ENGINEER'S STATEMENT <br /> I certify, as a duly registered professional engineer in the State of California, that the <br /> Perimeter Gas Migrdtion Control System construction at the Forward Sanitary Landfill, <br /> documented herein, was completed in conformance to the approved design plans and <br /> specifications, including preservation of the existing landfill containment components. <br /> This Construction Quality Assurance Report has been prepared by EMCON/OWT — <br /> Shaw Environmental, Inc. as authorized by Allied Waste Industries. This report has been <br /> prepared for the exclusive use of Allied Waste Industries and its designated consultants, <br /> for documentation of the Installation of the Perimeter Gas Migration Control System for <br /> the Forward Sanitary Landfill. The only warranty made by us in connection with this <br /> document is that we have used that degree of care and skill ordinarily exercised under <br /> similar conditions by reputable members of our profession practicing in'the same or <br /> similar locality. No other warranty, express or implied, is intended. <br /> EMCON/OWT—Shaw Environmental, Inc. <br /> Andrew P. Wang, R.C.E. 4689 <br /> Senior Project Engineer <br /> i <br /> Date <br /> EMCON/OWT <br /> N:\—LANDFIL\AWI Austin Road-Forward\2004 SVE CQA\text\report\CQA report final.doc Rev.0,115105 <br /> ii <br />