Laserfiche WebLink
CONTENTS <br /> ENGINEER'S STATEMENT <br /> 1 INTRODUCTION 1-1 <br /> 1.1 Background 1-1 <br /> 1.2 Purpose 1-1 <br /> 2 PROJECT OVERVIEW 2-1 <br /> 2.1 Summary of Construction Work 2-1 <br /> 2.2 Project Principals - 2-1 <br /> 2.3 Construction Work Sequence 2-3 <br /> 2.4 Construction Quality Assurance 2-3 <br /> 3 SUMMARY OF CONSTRUCTION 3-1 <br /> 3.1 Perimeter LFG Extraction Wells 3-1 <br /> 3.2 Multi-Level LFG Monitoring Probes 3-2 <br /> 3.3 LFG Collection Piping 3-3 <br /> 4 CONCLUSIONS 4-1 <br /> APPENDIX A WELL AND PROBE DRILLING/CONSTRUCTION LOGS <br /> APPENDIX B DAILY CQA FIELD REPORTS <br /> APPENDIX C RECORD DRAWINGS <br /> APPENDIX D SELECT PHOTOGRAPHS AND PHOTO LOG <br /> EMCON/OWT <br /> N:\—LANDFIL\AWI Austin Road-Forward\2004 SVE CQA\text\report\CQA report final.doc Rev.0,1/5/05 <br /> iii <br />