Laserfiche WebLink
1.2.2 CQA Report <br /> EMCON/OWT — Shaw Environmental, Inc. (EMCON) was responsible for monitoring <br /> the well drilling and installation and the piping construction, and verifying that the <br /> material and installation procedures were consistent with the approved construction <br /> drawings and technical specifications. <br /> The purpose of this report is to summarize the perimeter LFG migration control system <br /> expansion construction and EMCON's construction quality assurance (CQA) activities. <br /> This report documents that, based on the observations of the CQA monitors, the <br /> construction was in general conformance with the construction drawings, the technical <br /> specifications, approved field engineering changes, and good construction practices. <br /> EMCON/OWT <br /> N:\_LANDFIL\AWI Austin Road-Forward\2004 SVE CQA\text\report\CQA report final.doc Rev.0,115/05 <br /> 1-2 <br />