Laserfiche WebLink
THERFORE,PURSUANT TO PUBLIC RESOURCES CODE DIVISION 30 AND <br /> CALIFORNIA CODE OF REGULATIONS,TITLE 27,DIVISION 7,YOU ARE <br /> HEREBY ORDERED TO: <br /> I. Continue routine explosive gas monitoring program. The monitoring program <br /> shall include, but not limited to, the evaluation of the existing gas monitoring <br /> probes and the concentration of landfill gas in the ambient air at ground surface. <br /> The minimum frequency of monitoring shall be monthly. <br /> 2. Submit gas monitoring reports to this LEA in accordance with the following <br /> schedule: <br /> Monitoring Period Reporting Deadline <br /> January-March April 30 <br /> April-June July 30 <br /> July-September October 30 <br /> October-December January 30 <br /> 3. Evaluate the effectiveness of phase 1 and 2 gas extraction wells of Forward Inc. <br /> corrective action plan. Submit the detailed report. including site map showing the <br /> locations of all gas extraction wells.to this LEA by June 30,2004. <br /> 4. The LEA has agreed to allow the installation of Phase 3 gas extraction wells of <br /> Forward Inc. corrective action plan, provided that Phase 1 and 2 gas wells have <br /> been installed and put in operation and have had no effect on the gas levels in the <br /> perimeter monitoring wells. Prior to installing the Phase 2 gas extraction wells the <br /> operator must submit the phase 3 action plan to this LEA for approval prior to <br /> commencing the installation of phase 3 gas extraction wells of the corrective <br /> action plan. The phase 3 action plan shall include,but not limited to,the <br /> proposed date of installation and destruction,the destruction plan,and any <br /> changes to the corrective action plan. All Phase 3 gas extraction wells shall be <br /> decommissioned within 120 days of installation and destroyed with in 180 of <br /> construction. <br /> 5. Evaluate the effectiveness of all 3 phases of gas extraction wells. Submit the <br /> report, including site map showing the locations of all gas extraction wells,to this <br /> LEA by October 30,2004. <br /> 6. If all 3 phases of gas extraction wells fail to reduce the concentration of explosive <br /> gas at the boundaries to less than 5%, submit a new corrective action plan to this <br /> LEA by November 30,2004. The new corrective action plan shall include, but <br /> not limited to, study of gas migration at the above-mentioned facility and the <br /> proposed action and schedule for compliance. <br /> Amended Notice and Order 03-01 Page 5 of 7 Forward Landfill <br /> May 10,2004 <br />