My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® 3.1 PROJECT DIRECTOR/PROJECT MANAGER <br /> The Project Director/Project Manager shall have overall authority for all CQA activities. <br /> 3.2 CONSTRUCTION MANAGER <br /> The Construction Manager will serve as the Project Director's on-site representative. All <br /> CQA functions will be under his direct authority. All coordination, reporting and issues <br /> related to non-compliance will be directed through the Construction Manager. In <br /> addition,he will participate with the Engineer and Geotechnical CQA Consultant in all <br /> decisions related to design issues which arise during the course of construction. <br /> 3.3 LANDFILL ENGINEER <br /> The Landfill Engineer will be responsible for reviewing all design issues which may arise <br /> during construction. The approval of the Landfill Engineer will be required prior to any <br /> design changes. <br /> 3.4 GEOTECHNICAL CQA CONSULTANT <br /> The Geotechnical CQA Consultant will be responsible for reviewing all earth material or <br /> ® geosynthetic material issues which may arise during construction. Geotechnical <br /> consultant approval will be required for any earth or geosynthetic material modifications <br /> or for any design modifications which may impact the performance of the final cover. <br /> 3.5 CQA OFFICER <br /> The CQA Officer will be a representative of the Geotechnicekl CQA Consultant and shall <br /> be responsible for overall review, observation, sampling and testing activities for <br /> construction. Specific duties of the CQA Officer include: <br /> • Review of all designs, Project Drawings and Specifications. <br /> • Implementation of the CQA Plan including: assignment and management of all CQA <br /> personnel; review of all field reports; and engineering review of all CQA related <br /> issues. <br /> • Review of all design changes. <br /> • Familiarization of all CQA Monitors with the site and the CQA requirements for the <br /> project. <br /> • Attendance at CQA related meetings, (i.e. preconstruction,progress and special <br /> ® meetings) as required. <br /> -5- <br /> C"2003-033\EDOMHILLCQAPLAN.DOC <br /> Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.