My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Participation in the preparation of Record Drawings. <br /> • Coordination of all field testing, sampling and laboratory testing. <br /> • Review of all field and laboratory test results and preparation of recommendations for <br /> appropriate responses. <br /> Review of all CQA Monitor's daily reports and logs. <br /> Notation of any on-site activities or conditions that could jeopardize the quality or <br /> function of the alternative final cover system and reporting of these to the <br /> Construction Manager. <br /> Preparation of a monthly summary of CQA activities. <br /> O Designation of a Senior CQA Monitor to act on his behalf at the site while operations <br /> are ongoing. <br /> Reporting of any unresolved deviations from the CQA Plan to the Construction <br /> Manager. <br /> Preparation of the final "As-Built" report for all completed earthwork construction <br /> activities. <br /> 3.6 CQA MONITORS <br /> 3.6.1 FIELD ENGINEER/FIELD GEOLOGIST <br /> The Field Engineer/Field Geologist will be a representative of the Geotechnical CQA <br /> Consultant and will be responsible for evaluation of whether all earth and/or geosynthetic <br /> materials conform to the requirements of the Project Drawings and Specifications. Duties <br /> of the Field Engineer/Field Geologist will include the following: <br /> • Subgrade inspection. <br /> • Review of the adequacy of all clearing, grubbing, stripping and site preparation in <br /> areas to receive fill. <br /> • Monitoring and evaluation of all material processing,mixing,blending and moisture <br /> conditioning operations. <br /> • Evaluation of the engineering characteristics of proposed on-site and/or imported <br /> cover materials. <br /> 40 <br /> -6- <br /> C'\Z003-033\EDOMHILLCQAPLAN.DOC <br /> Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.