reworked and/or removed and replaced until the required condition has been attained. <br /> No additional fill shall be placed over an area until the last fill has been tested <br /> horizontally and vertically and meets the requirements of this document to the <br /> satisfaction of the Geotechnical CQA Consultant. <br /> T. Where work is interrupted by heavy rains, fill operations shall not be resumed until <br /> observations and field tests by the Geotechnical CQA Consultant indicate the <br /> moisture content and density of the in-place fills and/or materials intended for <br /> placement are within the limits previously specified in(P). <br /> U. Drainage provisions shall be constructed in compliance with the recommendations of <br /> the Design Engineer and as shown on the Project Drawings. <br /> V. If any unanticipated earth conditions of an adverse or potentially adverse nature are <br /> encountered during grading, the Geotechnical CQA Consultant shall investigate, <br /> analyze and make recommendations to mitigate these conditions. <br /> W. Unless otherwise specified by the Geotechnical CQA Consultant, no permanent cut <br /> slopes shall be excavated higher or steeper than that allowed by the ordinances of <br /> controlling governmental agencies. <br /> X. All excavated or fill surfaces shall be graded to provide good drainage and prevent <br /> ponding of water. Surface water shall be controlled to avoid damage to adjoining <br /> properties or to finish work on the site. <br /> Y. All cut and/or fill slopes will be planted for erosion protection in accordance with the <br /> Project Drawings and Specifications. <br /> 6.0 CQA MONITORING FOR EARTH MATERIALS <br /> 6.1 GENERAL <br /> Construction of the Forward Sanitary Landfill final cover improvements shall be <br /> performed in accordance with the Project Drawings and Specifications and shall be <br /> continuously observed, and routinely sampled and tested by the CQA Monitor(s) during <br /> construction and mixing operations for the physical parameters described in this section. <br /> The testing frequency presented herein is a minimum. Additional tests will be conducted <br /> by the CQA Monitor for retests and at any time that in the opinion of the CQA Monitor, <br /> additional testing is required and/or a deficiency is suspected. Retests of previously failed <br /> areas will be performed at the discretion of the CQA Monitor when, in his opinion, <br /> sufficient reworking of the area has been performed by the Contractor to warrant a retest. <br /> Following a thorough re-working of a failed area,retesting will be performed by the CQA <br /> Monitor to evaluate whether the re-worked area meets the requirements of the project. <br /> -12- <br /> C"\2003-033\EDOMHILLCQAPLAN.DOC <br /> Geologic Associates <br />