Laserfiche WebLink
2. The drawings used to develop the "October 6, 2000" estimate were not available <br /> for review. <br /> 3. Bullseye was preparing their estimates of remaining airspace correctly, and all of <br /> their work was available for review. <br /> Given the (a) inherent inaccuracy in Item 1, (b) the lack of verification in Item 2, and (c) <br /> the confirmed accuracy and verification in Item 3, Forward Landfill personnel have <br /> concluded that the Bullseye estimates are more appropriate for use than the original JTD <br /> estimates. Consequently, the Bullseye estimates are the basis for the new (changed) <br /> airspace and site life estimates presented in the most recent JTD amendment. <br /> Please note that there was never a second, or independent, "June 15, 2002" (i.e., JTD) <br /> estimate. Therefore, one cannot say definitively that the JTD estimate was correct, or <br /> incorrect. One can say only that the Bullseye estimates appear to be more accurate and <br /> appropriate for use. <br /> Please contact me at (408) 945-2851 if you have any questions or comments regarding <br /> this matter. <br /> V�ey truly yours, <br /> Curtis G. Fujii (� <br /> Environmental Manager <br /> Cc Mike Caprio, Allied Waste Industries <br /> Kevin Basso, Forward, Inc. <br /> Lochlin Caffey, Allied Waste Industries <br /> John Boucher, Bryan A. Stirrat &Associates <br /> 3 <br />