My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 1:06:23 PM
Creation date
7/3/2020 10:50:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
579
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil with Tars 6:1 <br /> Clean and Contaminated Soil (including Intermediate 4:1 <br /> Cover <br /> Shredded Tires 12" thick 4.7:1 <br /> PGM 12" thick 4.7:1 <br /> Com ostable Material 12" thick 4.7:1 <br /> Treated Auto Shredder Residue (18" assumed - Title 3.1:1 <br /> 27 requires an average compacted thickness less than <br /> 24" <br /> C&D (Inert) Material (12" assumed - Title 27 requires 4.7:1 <br /> an average compacted thickness less than 18" <br /> Ash and Cement Kiln Dust 12"thick 4.7:1 <br /> NOTE: Thickness shown above are consistent with Title 27, Section 20690 <br /> Predominately, Forward Inc. utilizes soil (both clean and contaminated), PGM <br /> and TASK. Volume calculations performed to estimate the above ratios for <br /> materials, other than soil, are included in Appendix C-1. Based on field testing of <br /> other ADC materials, it was determined that ash and cement kiln dust are <br /> believed to have similar properties to PGM, and that C&D material is believed to <br /> have properties similar to treated auto shredder residue. No field testing of the <br /> ash and cement kiln dust material was performed due to the small quantities <br /> received at this site. <br /> However, based on the refuse to cover ratios listed above, Forward Inc. will use <br /> an effective refuse-to-cover ratio of 4:1 for purposes of calculating the landfill's <br /> remaining capacity and site life. In addition, the remaining waste capacity and <br /> site life are reviewed annually by Forward Inc. and are required to be updated in <br /> accordance with 27 CCR, Section 21640, in conjunction with a review of the <br /> solid waste facilities permit every five years. <br /> 4.6 SITE CAPACITY <br /> As previously discussed, the disposal area footprint consists of approximately <br /> 387.8 acres. The total site capacity is based on the difference between the <br /> estimated subgrade excavation and the final disposal area contours. The total <br /> Forward Landfill JTD 4-11 <br /> J:\Allied\Forward\JTD Amendment\March 2006 JTD-LEA Resp\JTD\JTD Sec 4 Final.doc: BRYAN A.STIRRAT&ASSOCIATES <br /> 05/24/02;Amendment No.1: 5/22/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.