Laserfiche WebLink
APPENDIX A <br /> • <br /> RLEINF9LDER.F ELD AC"' TES PROTOCOL - <br /> Tbc Sampling and Analysis Plan (Klcinfelder, Novnbcrl, 1994) describes how Forward, Inc. <br /> conducts <br /> groundwater monitoring for. WW A.. The infotmation contained in the Plan <br /> sup=edes sections related to sampling anti analysis in the April 1989 Poswlosure Plan, <br /> Addendum #1 tud Addendum #2. The on of groundwater'sampling methods and <br /> procedures discussed in this appendix,Kjleinfelder Field Activities Protocol,are an excerpt of the <br /> more comprehensive Sampling and Analysis Plan. <br /> GROUNDWATER MONITORING. <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring wells at Forward are equipped with dedicated submerged pumps for <br /> Ping and collection groundwater samples.. The field technician petforrriing the gmdtivr <br /> monitoring will have a list ofi <br /> r <br /> cxluipmcnt that-should be available with.which to complete the <br /> monitoring.' The necessary aquupmcnt is listed below. This list includes actual equipment used <br /> to purge and sample the wells in addition. to personal.pr6tective gear that must be worn for <br /> protection and to reduce the potential for cross.contamination of the wells and samples. Some of <br /> the equipment used includes various instruments which require calibration. Ca11-bration- <br /> procedures are discussed below, <br /> Calibration Procedures <br /> Many of the meters tbat are used in the field must be calibrated to produce reliable results. The <br /> following discusses cali'biation rationale,procedures,and frequency for the instnments. <br /> Water Level Indicator <br /> Water lcvcl indicators roust'be calibrated regularly to assure that data is not being measured <br /> incorrectly clue to the cable stretching. To calibrate the water level indicator the cable is nm out <br /> to its entire length and measured against a tape measure. The 0 point is the <br /> point on the probe <br /> which completes the circuit when contacted by the water. ?itis completed circuit causes the <br /> -453 84 9-F0112310R323 A-t1 4 <br /> z000�c�.�aa,tom. �'' <br />