Laserfiche WebLink
vECTOR <br />ENGINEER/NG,INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill <br />021605.06 <br />6 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />August 25, 2005 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Lwy Simms <br />Montle Christie <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native light brown silty Clay <br />Hot, clear and breezy <br />Ken Davila <br />hquipment on site: I <br />1-Sheepsfoot compactor, 2- water trucks, 2- D6 dozers, 6-627 scrapers, 1 -John Deere with discs, 1- 966 loader <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the location listed above. Guinn <br />Construction used all the scrapers and continued filling on the west toe of slope working northward to the <br />northwest corner throughout the day. One dozer, one water truck and sheepsfoot also worked there. The <br />other water truck moisture conditioned the cut area and the haul roads. In the morning, the loader and one <br />® dozer placed granular drainage material along the west FU -05 floor at the tie in to the FU -04 cell. <br />LE <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: AfZ <br />