Laserfiche WebLink
TZECTOR <br />ENGINEERING, INC <br />0 DALY CONSTRUCTIONâ–ş REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill <br />021605.06 <br />7 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />Au st 26, 2005 <br />Frida <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native light brown silty Clay <br />Hot, clear and breezy <br />Ken Davila <br />equipment on site: I <br />1-Sheepsfoot compactor, 2- water trucks, 1- D6 dozer, 6-627 scrapers, 1 -John Deere with discs, 1- 623 paddle wheel scraper <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the location listed above. Guinn <br />Construction used all six of the 627 scrapers and continued filling on the west toe of slope working <br />northward to the northwest comer throughout the day. One dozer, one water truck and sheepsfoot also <br />worked in that location. The other water truck moisture conditioned the cut area behind the tractor with <br />®discs and the haul roads. The 623 paddle wheel scraper placed operations layer on the FU -05 floor. <br />M. <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: jqC <br />