Laserfiche WebLink
VfCTOR <br />INEERING, INC. <br />REPORT0 DALY CONSTRUCTION FIELD <br />Project Name: <br />Project No. <br />Daily Field ReportSequence Number: <br />Forward Landfill <br />021605.06 <br />g <br />Location of Work: <br />Manteca, Ca <br />Client Or Manager <br />Ruben Ramirez <br />Date: I Day of The Week: <br />Au st 27, 2005 Saturday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material Weather: CQA Technician: <br />On site native light brown silty_Clay Hot, clear and breezy Ken Davila <br />Equipment on site: <br />1- water truck, 1- D6 dozer 1- 627 scraper, 1- shee sfoot roller <br />_°-.-' - <br />�.— Y L' U k"r-Cm worec completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the location listed above. Guinn <br />Construction began and completed the south and east berms of the FU -05 cell. Material was excavated from <br />the east borrow area and placed with the scraper. Compaction was performed by the sheepsfoot and <br />moisture conditioning was supplied by the water truck. Work was completed in the mid afternoon. <br />Five (5) nuclear moisture density tests were performed on the east berm with all tests <br />passing the <br />specifications in moisture and density. The on site foreman was verbally informed of the test results. <br />pared By: Reviewed By: Oc. <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />