Laserfiche WebLink
Jr/IrECTOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTION/ REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill Closure <br />021605.06 <br />13 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />Se tember 2, 2005 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Lagy Simms <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native light brown silty Cl a <br />Hot to warm, clear and breezy <br />Ken Davila <br />Eqmpment on site: <br />2-Sheepsfoot rollers, 3- water trucks, 2- D6 dozers, 7-627 scrapers, 1 -John Deere with discs <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the location listed above. Guinn <br />Construction used all of the 627 scrapers to haul clay to the west slope throughout the day. One dozer, one <br />water truck and the sheepsfoot roller also worked in that same location. The other water trucks moisture <br />conditioned the haul roads and the cut area behind the tractor with discs. The other dozer ripped the cut <br />®area. <br />All four (4) of today's nuclear moisture density tests and all previous tests this week have passed the <br />specified values in density and moisture content. The on site foreman was verbally informed of the test <br />results. <br />epared By: Reviewed By: <br />NC <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />