Laserfiche WebLink
17EC" <br />ENGINEERING, INC. <br />CONSTRUCTION0 DAILY REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill Closure <br />021605.06 <br />12 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />September 1, 2005 <br />Thursda <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Montie Christie, Lochlin Caffey <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native light brown sil Clay <br />Hot, clear and breezyKen <br />Davila <br />Equipment on site: <br />2-Shee sfoot rollers, 3- water trucks 2- D6 dozers, 7-627 !Era ers 1 -John Deere with discs <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the location listed above. Guinn <br />Construction used all of the 627 scrapers to haul clay to the north and west slopes throughout the day. One <br />dozer, one water truck and the sheepsfoot roller also worked in that same location. The other water trucks <br />moisture conditioned the haul roads and the cut area behind the tractor with discs. The other dozer ripped <br />the cut area. <br />Vector's project manager arrived on site and collected the permeability samples and samples for other off <br />site testing. <br />A mid morning meeting was held to discuss ongoing fill operations and upcoming schedules. <br />M <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: &f,(- <br />