Laserfiche WebLink
Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No. 021605.06 <br /> 1.0 INTRODUCTION <br /> This report summarizes the construction quality assurance (CQA) observations <br /> and activities performed by Vector Engineering, Inc. (Vector) for Forward, Inc. <br /> (Forward), during the construction of the Stage lA Partial Final Closure (Stage <br /> 1A) at the Forward Landfill. The portion of the Stage lA Closure is depicted on <br /> Sheet 2 of the construction drawings. <br /> CQA activities included monitoring earthworks construction and geosynthetics <br /> installation. This final report contains detailed documentation that the <br /> construction and CQA activities associated with the Stage lA closure were <br /> constructed in accordance with approved clarifications and modifications <br /> thereto, as well as in general accordance with the following documents: <br /> • Title 27 of the California Code of Regulations; <br /> • Construction Drawings, Stage IA Partial Final Closure, Forward <br /> Landfill, Bryan A. Stirrat and Associates, June 2005, <br /> • Technical Specifications, Stage 1A Partial Final Closure, Forward <br /> Landfill, Bryan A. Stirrat and Associates, June 2005, and <br /> • Construction Quality Assurance Manual, Stage IA Partial Final Closure, <br /> Forward Landfill, Bryan A. Stirrat and Associates, June 2005. <br /> Vector performed work on this project under authorization from Forward's <br /> project manager, Mr. Lochlin Caffey. This report was prepared for Forward by <br /> Mr. Ken Davila, CQA Monitor and Mr. Monte Christie, PE, GE, Project <br /> Manager. Mr. Bryan Fritzler, PE, Company CQA manager of Vector, provided <br /> peer review of this report. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -1- <br />