Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No.021605.06 <br /> 2.0 PROJECT DESCRIPTION <br /> 2.1 Project Components— Stage 1A Partial Final Closure <br /> The Stage lA closure encompasses approximately 37 acres of side-slope on the <br /> west and north slopes. Stage lA provides final closure for a portion of the <br /> Forward Landfill, the west and north slopes. The closure system installed in <br /> Stage lA area consists of the following components (from top to bottom): <br /> SIDE-SLOPES <br /> • 3-foot thick compacted monolithic soil; and <br /> • 1-foot thick existing interim cover. <br /> Several areas on the cover had seep collectors installed to capture potential <br /> seeps. Landfill gas piping and components were also relocated to facilitate final <br /> cover construction. <br /> 2.2 Project Construction Summary <br /> The construction of the Stage lA Closure commenced in early August 2005. <br /> The Stage lA closure (see Figure 1) was substantially completed by October 19, <br /> 2005, and consisted of the construction of the cover system and <br /> appurtenances. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -2- <br />