My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_15
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_15
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_15.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIECTOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number. <br />Forward Landfill Closure <br />021605.06 <br />37 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 7, 2005 <br />Friday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />---JWeather. <br />CQA Technician: <br />On site native brown silt ClayWarm, <br />clear and breezy <br />Carlos Padilla <br />Equipment on site: <br />1-Shee sfoot roller, 2 -water trucks, 2-136 dozers, 6-627 scra ers, 1-140 blade, 1-966 loader <br />—, Ml..e WON% cvd.pieded during me nay, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using the scrapers to haul clay from the northern and central cut areas throughout <br />the day. Seven (7) scrapers continued placing fill material from west to east. One dozer, one of the water <br />®trucks and the sheepsfoot roller also worked on the north slope fill area. The other water truck moisture <br />conditioned the haul roads and the cut area behind the other dozer. <br />Two moisture and clay contents tests were perfonned from the fill material being placed on the north <br />slope fill area. All tests passed the specified values in density and moisture content and the on site foreman <br />was verbally informed of the test results. <br />Guinn Construction continued deploying gravel material on the upper bench of the FU -05 cell already <br />covered with HDPE 60 mil DT geomembrane + geotextile carpet by GSE Lining. <br />r Prepared 13y: Revic�� ed By: X46 -- <br />II __ � <br />412103. Rev. 0 1 of 1 <br />C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.