_E CTOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTIONREPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number. <br />Forward Landfill Closure <br />021605.06 <br />39 <br />Location of Work: <br />Client Or Manager <br />Date: Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 11, 2005 Tuesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material Weather. CQA Technician: <br />On site native brown silt ClayWarm, clear and breezy Carlos Padilla <br />Equipment on site: <br />1-Shee sfoot roller, 2 -water trucks, 2-D6 dozers, 8-627 sera ers, 1-140 blade <br />Vngrre /nee....i6.......d. --- -.i_a_I J . . <br />— o.,.:�..a— woR n completed during me day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using the scrapers to haul clay from the northern and central cut areas throughout <br />the day. Eight (8) scrapers continued placing fill material from west to east. One dozer, one of the water <br />®trucks and the sheepsfoot roller also worked on the north slope fill area. The other water truck moisture <br />conditioned the haul roads and the cut area behind the other dozer. <br />Eighteen (18) nuclear moisture density tests, two (2) moisture content and two (2) clay content tests were <br />perfonned on the fill material being placed on the north slope fill area. All tests passed the specified values <br />in moisture content and the on site foreman was verbally informed of the test results. <br />Guinn Construction continued deploying soil material on the upper bench of the FU -05 cell, on top of the <br />geotextile covering the 6" gravel fill. <br />Yesterday, half of the FU -05 cell area it was covered with 6" fill soil, in accordance with specifications. <br />The scraper continues hauling till material from the soil borrow area to the FU -05 cell. The dozer equipped <br />with GPS, keeps pushing it at the requested level on the second half area remaining. <br />Prepark:d By: <br />4`23'03. Rev. 0 1 of 1 <br />C-2 <br />Review ed By: X, C <br />