Vc,TOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTIONREPORT <br />Project Name: <br />Forward Landfill Closure <br />Project No. <br />021605.06 <br />Daily Field Report Sequence Number. <br />40 <br />Location of Work: <br />Manteca, Ca <br />Client Or Manager <br />Ruben Ramirez <br />Date: Day of The Week: <br />October 12, 2005 Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material Weather. CQA Technician: <br />On site native brown silty Clay Warm, clear and breezy Carlos Padilla <br />Equipment on site: <br />1-Shee sfoot roller, 2 -water trucks, 2-D6 dozers, 7-627 scra ers, 1-140 blade <br />Nln'r c In .... H.- »e, <br />— .. K —allp—ru dum,00g ure day, any proutetns and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using the scrapers to haul clay from the northern and central cut areas throughout <br />the day. Seven (7) scrapers continued placing fill material from west to east. One dozer equipped with GPS <br />®instruments, one of the water trucks and the sheepsfoot roller also worked on the north slope fill area. The <br />other water truck moisture conditioned the haul roads and the cut area behind the other dozer. <br />Twenty-two (22) nuclear moisture density tests, two moisture and two clay content tests were performed <br />from the fill material being placed on the north slope fill area. All tests passed the specified values in <br />density and moisture content and the on site foreman was verbally informed of the test results. <br />Yesterday afternoon, at the end of the working hours, Guinn Construction finished the fill with soil <br />material on the upper bench of the FU -05 cell. <br />This morning, one of the scrapers hauled material from the borrow area and starts tilling up the slope which <br />ends the existing trashes landfill and connected to the FU -05 cell already covered up with the same soil. <br />The anticipated thickness for this slope subgrade fill is 4 feet. <br />No incidents occurred. <br />gxurd By: <br />4223:03, Rcv. 0 1 of I <br />C-2 <br />Rcvicwcd By: M 6 <br />