Laserfiche WebLink
1,7EC"TOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REP0,121 <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number. <br />Forward Landfill Closure <br />021605.06 <br />42 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 14, 2005 <br />Friday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Guinn Construction <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather. <br />CQA Technician: <br />On site native brown silty Clay <br />Warm, clear and breezy <br />Ken Davila <br />Equipment on site: <br />1 -Shea sfoot roller, 2 -water trucks, 2-D6 dozers, 7-627 scra ers, 1-140 blade, 1-966 loader <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using the scrapers to haul clay from the northern and central cut areas throughout <br />the day. The area of the northern cut area is still closed to the scrapers because of the very high sand <br />content. This area will remain closed until it is either removed or ripped. Five (5) scrapers continued placing <br />fill material from west to east along the eastern area. One dozer, with GPS, one of the water trucks and the <br />sheepsfoot roller also worked on the north slope fill area. The other water truck moisture conditioned the <br />haul roads and the cut area behind the other dozer. The other two scrapers continued hauling subgrade <br />material to the piggyback slope of the FU -05 cell. <br />A total of twenty-two (22) nuclear moisture density tests were perfonned on the material placed on the <br />north slope fill area and on the piggyback slope. All tests passed the specified values in density and <br />moisture content and the on site foreman was verbally informed of the test results. <br />Prepared By: Rc� ic\ked 13y: C <br />i <br />4123 03. Rc%,. 0 1 oC 1 <br />C-? <br />