TOR <br />ENGINEERING, INC. <br />DAILY0 • / / REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number. <br />Forward Landfill Closure <br />021605.06 <br />46 <br />Location of Work: <br />Client Or Manager <br />Date: Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 19, 2005 Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Guinn Construction <br />GSE <br />BAS <br />General Foreman: Liner Superintendent: Others: <br />Larry Simms Lochlin Caffey <br />Source and Description of Fill Material Weather CQA Technician: <br />On site native brown silty Clay Warm, mostly sunny and breezy Ken Davila <br />Equipment on site: <br />1 Sheepsfoot roller, 2 -water trucks, 2-D6 dozers, 7-627 scrapers, 1-140 blade <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using seven (7) scrapers and changed haul locations to the fill area of the closure <br />slope. The scrapers placed fill material from east to west along the north slope. One dozer, with GPS, and <br />®the sheepsfoot roller worked with the scrapers. The other dozer and blade worked on cutting and shaping <br />the piggy back slope of the FU -05 cell. The water trucks moisture conditioned the haul roads and the cut <br />area. <br />Thirteen (13) nuclear moisture density tests were performed on the material placed on the north slope <br />closure area. All tests passed the specified values in density and moisture content and the on site foreman <br />was verbally informed of the test results. <br />Hydroseeding continued on the west slope of the closure area throughout the day. <br />P'— rcparcci By: Kv\ ie xed li\ : 6 <br />J <br />123,03, Rcv. u 1 of i <br />-7 <br />