1W 1r'ff—T <br />vr, CTOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number. <br />Forward Landfill Closure <br />021605.06 <br />47 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 25, 2005 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />GSE <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />I <br />I Lochlin Caffe <br />Source and Description of Fill Material <br />Weather <br />CQA Technician: <br />On site native brown silty Clay <br />Warm, mostly sunny and breezy <br />Ken Davila <br />Equipment on site: <br />1-Shee sfoot roller, 2 -water trucks, 2-D6 dozers, 7-627 scra ers, 1-140 blade <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation of the geocomposite installation on the piggy <br />back slope of the FU -05 cell. Composite was deployed from east to west on the western half of the slope <br />and west to east along the south tie to the 5:1 slope. Zip tying of the geocomposite and sewing of the <br />® geotextile portion was completed in the late afternoon. <br />Guinn backfilled the anchor trench with the dozer in the mid-morning and I informed the supervisor that <br />placement of the operations layer could begin tomorrow mid-morning. <br />Vector project manager, Monte Christie, was on site to complete the BAT testing of the Stage IA closure <br />cover construction and begin demob of the on site laboratory equipment. <br />Prepared By: <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: <br />