Laserfiche WebLink
Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No.021605.06 <br /> 2.3 Project Personnel <br /> The following personnel participated in the construction of Stage 1A closure. <br /> PROJECT ROLE ORGANIZATION NAME <br /> Owner Forward Inc. Lochlin Caffey <br /> Ruben Ramirez <br /> General Contractor Guinn Construction Larry Simms <br /> Design Engineer Geo-Logic Associates Gary Lass, PE <br /> Bryan A. Stirrat and Mike Cullinane, PE <br /> Associates Richard Genzel <br /> CQA Project Vector Engineering, Inc. Monte Christie, PE, GE <br /> Manager/Certifying <br /> Engineer <br /> Assistant CQA Project Vector Engineering, Inc. Bryan Fritzler, PE <br /> Manager <br /> Lead CQA Monitor Vector Engineering, Inc. Ken Davila <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -3- <br />