i r <br /> Ms. Christina Carbajal <br /> June 6, 2006 <br /> Page 5 <br /> Finally, SCS routinely conducts a pressure drop survey (i.e., measurement of main pipeline <br /> pressure at various points throughout the LFG collection system). The results of this survey <br /> indicated that no major restrictions within the LFG collection system currently exist and all <br /> accessible extraction wells are receiving adequate vacuum. <br /> LFG Blower/Flare Station (BFS) <br /> Visual observations and testing of the LFG BFS was conducted on May 5, 8, 13, 16, 23 and 31, <br /> 2006. During these visits, operating parameters are monitored and mechanical and electrical <br /> components are checked for workability. Throughout the reporting period, the BFS was set to <br /> operate continuously. BFS data is shown in Table 4. <br /> SCS understands the BFS operated as programmed throughout the reporting period with the <br /> exception of the following scheduled shutdown: <br /> • On May 23, 2006, SCS shutdown the BFS to switch operation of the LFG blowers and <br /> clean the flame scanner components. Upon completion of this work, the BFS was <br /> restarted and normal operation verified. <br /> On May 16, 2006, SCS performed monthly BFS Condensate Storage Tank Carbon Vent VOC <br /> breakthrough testing. Photo Ionization Detector(PID) results indicated that no VOC's were <br /> detected at the inlet and outlet of the carbon vent. <br /> In addition, as previously reported, SCS observed several areas of paint on the upper portion of <br /> the flare stack, which have begun to discolor and/or flake off the exterior surface. SCS will <br /> continue to inspect these areas and make further recommendations as necessary. <br /> Finally, during the reporting period, the flare exit gas temperature was observed to remain above <br /> the SJVAPCD 1400 degree Fahrenheit prescribed operating criteria. The lowest flare exit gas <br /> temperature observed by SCS during our site visits was approximately 1480 degrees Fahrenheit. <br /> All other operating parameters remained within acceptable operating limits. <br /> Site Surface Observation <br /> Visual observation of the landfill surface along the extent of the extraction system is also <br /> performed on a monthly basis. Observations for erosion, surface cracks (that might allow LFG to <br /> escape or promote air intrusion) and settlement around wells, laterals and main pipelines are <br /> conducted. <br />