Laserfiche WebLink
i r <br /> Ms. Christina Carbajal <br /> June 6, 2006 <br /> Page 6 <br /> During this reporting period, no settlement that might adversely impact (e.g., allow condensate <br /> accumulation such that a complete blockage could occur) the LFG collection system operation <br /> was observed, with the exception of the previously mentioned area of flooding on the Austin <br /> section side of the landfill. <br /> Standard Provisions <br /> This report addresses conditions at the subject site during the reporting period only. Accordingly, <br /> we assume no responsibility for any changes that may occur subsequent to our monitoring which <br /> could affect the quantity of LFG at the subject site or adjacent properties. The client is <br /> responsible for ensuring that SCS and on-site personnel are the only parties designated to operate <br /> and adjust the LFG systems. <br /> Should you have any questions, do not hesitate to contact or either of the undersigned. <br /> Very truly yours, <br /> Arthur E. Jones <br /> Project Superintendent <br /> Anton Z. Svorinich <br /> Project Manager <br /> SCS FIELD SERVICES <br /> AZS:das/Forward Austin Rpt <br /> cc: Lochlin Caffey—Keller Canyon Landfill <br />