My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_21.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Christina Carbajal <br /> July 19, 2006 <br /> Page 5 <br /> are checked for workability. Throughout the reporting period,the BFS was set to operate <br /> continuously. BFS data is shown in Table 3. SCS understands the BFS operated as programmed <br /> throughout the reporting period. <br /> On June 14, 2006, SCS performed monthly BFS Condensate Storage Tank Carbon.Vent VOC <br /> breakthrough testing. Photo Ionization Detector(PID)results indicated that no VOC's were <br /> detected.at the inlet and outlet of the carbon vent. <br /> Also,on June 15,2006, SCS as requested by Allied personnel assisted in the annual flare source <br /> emissions testing as required by the SJVAPCD,which was performed by others. <br /> In addition, as previously reported, SCS observed several areas of paint on.the upper portion.of the <br /> flare stack,which have begun to discolor and/or flake off the exterior surface. SCS will continue <br /> to inspect these areas and make further recommendations as necessary. <br /> Finally, during the reporting period,the flare exit gas temperature was observed to remain above <br /> the SJVAPCD 1400 degree Fahrenheit prescribed operating criteria. The lowest flare exit gas <br /> temperature observed by SCS during our site visits was approximately 1525 degrees Fahrenheit. <br /> All other operating parameters remainedwithin acceptable operating limits. <br /> Site Surface Observation <br /> Visual.observation of the landfill surface along the extent of the extraction system is also <br /> performed on a monthly basis. Observations for erosion, surface cracks(that might allow LFG to <br /> escape or promote air intrusion)and settlement around wells, laterals and main pipelines are <br /> conducted. <br /> During this reporting period, no settlement that might adversely impact(e.g.,allow condensate <br /> accumulation such that a complete blockage could occur) the LFG collection system operation was <br /> observed,with the exception of the previously mentioned area of flooding on the Austin section <br /> side of the landfill. <br /> Standard Provisions <br /> This report addresses conditions at the subject site during the reporting period only. Accordingly, <br /> we assume no responsibility for any changes that may occur subsequent to our monitoring Wbich <br /> could affect the quantity of LFG at the subject site or adjacent properties. The client is responsible <br /> for vmsuring that SCS and on-site personnel are the only parties designated to operate and adjust <br /> the LFG systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.