Laserfiche WebLink
WMU FU-06 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> 1.0 INTRODUCTION <br /> This report summarizes the construction quality assurance (CQA) observations and <br /> activities performed by Vector Engineering, Inc. (Vector) for Forward, Inc. <br /> (Forward), during the construction of the central portion of WMU FU-06 at the <br /> Forward Landfill. The central portion of WMU FU-06 is depicted on Sheet 2 of the <br /> construction drawings. This report compiles the completed construction of the <br /> entire central portion. A CQA Report for the northern portion of WMU FU-06 was <br /> previously submitted and approved by the RCB. <br /> CQA activities included monitoring earthworks construction, geosynthetics <br /> installation, and collection piping installation. This final report contains detailed <br /> documentation that the construction and CQA activities associated with the WMU <br /> FU-06 composite liner system, were constructed in accordance with approved <br /> clarifications and modifications thereto, as well as in general accordance with the <br /> following documents: <br /> • Title 27 of the California Code of Regulations; <br /> • Construction Drawings, WMU FU-06, Forward Landfill, Lewis <br /> Engineering, March 2006, <br /> • Technical Specifications, WMU FU-06, Forward Landfill, Lewis <br /> Engineering, March 2006, and <br /> • Construction Quality Assurance Manual WMU FU-06, Forward <br /> Landfill, Lewis Engineering, March 2006. <br /> Vector performed work on this project under authorization from Forward's project <br /> manager, Mr. Lochlin Caffey. This report was prepared for Forward by Mr. Michael <br /> Strobel, CQA Monitor and Mr. Monte Christie, PE, GE, Project Manager. Mr. <br /> Bryan Fritzler, PE, Company CQA manager of Vector, provided peer review of this <br /> report. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive• Grass Valley,CA 95945•(530)272-2448 <br /> -1- <br />