Laserfiche WebLink
WMU FU-06 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> 2,3 Project Personnel <br /> The following personnel participated in the construction of WMU FU-06. <br /> PROJECT ROLE ORGANIZATION NAME <br /> PROJECT ROLE ORGANIZATION NAME <br /> Owner Forward Inc. Lochlin Caffey <br /> Ruben Ramirez <br /> Earthworks Contractor Guinn Construction Larry Simms <br /> Geosynthetics Contractor GSE Lining Jerry Slinkard <br /> Surveying RJA &Associates Buck Buxton, PLS <br /> Design Engineer Lewis Engineering Sangeeta Lewis, PE <br /> CQA Project Manager/ Vector Engineering, Inc. Monte Christie, PE, GE <br /> Certifying Engineer <br /> Assistant CQA Project Manager Vector Engineering, Inc. Bryan Fritzler, PE <br /> Lead CQA Monitor Vector Engineering, Inc. Mike Strobel <br /> CQA Monitors Vector Engineering, Inc. Tom Brady <br /> Janet Strobel <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -4- <br />