My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-06 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> ® 5:1 SIDESLOPES <br /> ® 1-foot thick protective operations layer (to be placed during <br /> operations); <br /> • Geocomposite drainage material; <br /> • 60-mil thick single-sided textured HDPE geomembrane; <br /> • Geosynthetic clay liner (GCL); and <br /> • Approximately 5-feet of engineered fill over existing Austin <br /> Road Landfill. <br /> 2.2 Project Construction Summary <br /> Earthwork construction of the 5:1 slope area of WMU FU-06 commenced in mid <br /> May 2006 and was essentially completed by June 8, 2006. Geosynthetics <br /> installation"on the 5:1 slope area started on August 29, 2006, with deployment of <br /> GCL, geocomposite and 60-mil single-side textured HDPE liner, and was completed <br /> on September 1, 2006. <br /> ® Earthwork in the Southern Portion of WMU FU-06 was started the first week of <br /> June 2006 and was surveyed at finished grade on August 10, 2006. Installation of <br /> geosynthetics was started on August 25, 2006, with deployment of GCL, 60-mil <br /> single and double-sided textured HDPE and 12 oz. cushion geotextile, and was <br /> completed on September 16, 2006. Placement of LCRS gravel, installation of the <br /> LCRS pipes and coarse gravel, deployment of 8 oz. filter geotextile and placement of <br /> the operations layer soils began on September 18, 2006 and was completed for leak <br /> testing on October 4, 2006. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.