My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-06 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> ® Field Panel identification: Prior to GCL deployment, Vector's CQA Monitor and <br /> GSE (liner contractor) discussed and agreed to the identification code for each panel <br /> deployed. During the deployment, Vector's CQA Monitor observed that the <br /> subcontractor marked the deployed panels and that each panel placed was marked <br /> with the manufacturer's roll number. <br /> Field Panel Placement: During the panel placement, Vector's CQA Monitor <br /> recorded panel deployment logs. These logs recorded the location (panel number and <br /> roll number), installation schedule (date and time), weather conditions <br /> (temperature and wind), and GCL type. To protect the GCL, HDPE liner was <br /> deployed concurrently with the GCL placement. The GCL panel deployment logs <br /> are presented in Appendix H. <br /> 5.2.3.2 Defects and Repairs <br /> ® Vector's CQA Monitor inspected all seams and non-seam areas of the GCL for <br /> defects, holes, displaced panels, premature hydration, and signs of contamination <br /> by foreign material. <br /> Vector's CQA Monitor recorded defects as part of the daily construction report. <br /> Appropriate repairs were completed prior to installation of the overlying HDPE <br /> material. <br /> 5.3 Geomembrane <br /> 5.3.1 Geomembrane Material <br /> A 60-mil thick high-density polyethylene (HDPE) geomembrane manufactured by <br /> GSE was used in the liner system for WMU FU-06. Double-sided textured was <br /> deployed on the floor and single-sided textured was used on the side-slopes of WMU <br /> FU-06. The installation and documentation of the two types of materials was the <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.