My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-05 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> 5.4.4 Deployment <br /> The panel deployment procedure was observed and documented by Vector's CQA <br /> Monitor. Our CQA Monitor observed that the conditions of the CQA manual were <br /> met during deployment. Vector's CQA monitor observed that proper seam overlap, <br /> seaming, tie-ins, and other manufacturer's written guidelines were followed. <br /> 5.4.5 Repair <br /> The geotextile materials were checked for defects during deployment and holes or <br /> tears were identified and repaired prior to placement of the cover materials. <br /> 5.5 Geocomposite <br /> 5.5.1 General <br /> A geocomposite drainage layer was placed as part of the LCRS for the side slopes of <br /> WMU FU-06. The geocomposite consists of a non-woven geotextile fused on one side <br /> of the HDPE geonet. <br /> 5.5.2 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CQA Monitor observed the unloading and <br /> storage of the geocomposite rolls. Each roll of geocomposite was logged in by roll <br /> number and the roll numbers then cross-checked against the quality control <br /> documents provided by the Contractor submittal. Following inspection of the rolls, <br /> the material was approved for installation. A copy of the receiving log and <br /> manufacturer's certifications for the geocomposite are included in Appendix L. <br /> 5.5.3 CQA Conformance Testing <br /> Select samples of the geocomposite were cut from random rolls at the <br /> manufacturing plant by the third party testing laboratory for conformance testing <br /> in accordance with the project specifications and CQA manual. Conformance testing <br /> included: <br /> Vector Engineering, Inc. • 143E Spring Hill Drive •Grass Valley,CA 95945•(530)272-2448 <br /> -34- <br />
The URL can be used to link to this page
Your browser does not support the video tag.