Laserfiche WebLink
WMU FU-05 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> 7.0 CONCLUSION <br /> Construction of the liner and LCRS components of the Central Portion of WMU <br /> FU-06 (see Figure 1) was completed in October 2006. Based on our observations <br /> and testing during the construction of the above referenced portion of the WMU FU- <br /> 06 composite liner system at the Forward Landfill, it is Vector's professional <br /> judgment that the construction was completed in general accordance with the <br /> project plans and specifications, CQA Manual, applicable regulations, and approved <br /> design modifications. <br /> 0 <br /> is <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -38- <br />