My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-05 November 2006 <br /> Forward Landfill Project No.021605.07 <br /> ® 6.0 POLYETHYLENE PIPE AND FITTINGS <br /> 6.1 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CA Monitor performed the receiving <br /> inspection of the HDPE piping, which consisted of: <br /> • verifying that the pipe is the proper size and dimensions with the <br /> specified perforations; <br /> ® visually inspecting the pipe for any damage that may have occurred <br /> during transportation and handling; <br /> • verifying and documenting that storage of the pipe was in accordance <br /> with the project specifications; and <br /> • verifying documentation required by the specifications was received. <br /> Documentation for the HDPE pipe is included in Appendix M. <br /> 6.2 Installation <br /> ® Vector's CQA Monitor observed that the pipe was installed at the locations specified <br /> in the construction drawings, and no damage occurred during the placement and <br /> backfill around and over the pipe. Vector's CQA Monitor spot-monitored the fusion <br /> welding operations to ensure that the welding followed the project specifications. <br /> In addition to the pipe, Vector's CQA Monitor observed the installation of the riser <br /> pipe and supports were constructed as specified in the specifications and <br /> construction drawings. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -37- <br />
The URL can be used to link to this page
Your browser does not support the video tag.