|
11
<br />MECTOR
<br />ENGINEERING INC.
<br />GEOMEMBRANE REPAIR LOG
<br />Project Name: Forwartd WMU FU -06 Material Type:
<br />60 -mil HDPE dst
<br />Project No.: 02.1605.07 Iz] Primary I ] Secondary I ] Other
<br />Repair
<br />#
<br />Seam/
<br />Panel
<br />Location
<br />REPAIR
<br />Date
<br />Description 2006 Equip # Operator
<br />TEST
<br />Date
<br />2006
<br />Type*
<br />Pass/
<br />Fail
<br />CQA
<br />Monitor
<br />193
<br />60,61,110
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />1 9/12
<br />VT
<br />Pass
<br />JLS
<br />194
<br />61,107,110
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />195
<br />60,61,107
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />196
<br />51,62,106
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />197
<br />50,102,104
<br />floor
<br />T 9/11
<br />1264
<br />1 AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />198
<br />49,50,102
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />199
<br />49,101,102
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />200
<br />1 48,49,101
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />1 9/12
<br />VT
<br />Pass
<br />JLS
<br />201
<br />48,49,98,101
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />202
<br />47,48,97
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />203
<br />47,97,98
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />204
<br />46,47,95
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />205
<br />47,95,97
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />206
<br />45,46,95
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />207 1
<br />45,93,95
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />208
<br />44,45,93
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />209
<br />44,82,93
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />210
<br />24,103,105
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />211
<br />23,24,105
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />212
<br />26,99,100
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />213
<br />25,27,100
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />214
<br />27,28,99
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />215
<br />28,29,96,97
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />216
<br />30,94,96
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />217
<br />30,83,85,94
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />218
<br />24,25,103
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />219
<br />28,97,99
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />220
<br />107,108,109
<br />floor
<br />T 9/11
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />221
<br />23,108
<br />42'N. SEOS
<br />BO 9/11
<br />1264
<br />AS
<br />9/11
<br />VT I
<br />Pass
<br />JLS
<br />222
<br />23,108
<br />15'N. SEOS
<br />BO 9/11
<br />1264
<br />AS
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />223
<br />23,108
<br />21' N. SEOS
<br />BO 9/11
<br />1264
<br />AS 1
<br />9/11
<br />VT
<br />Pass
<br />JLS
<br />IL_L4
<br />20,111,113
<br />floor
<br />T 9/12
<br />1264
<br />AS 1
<br />9/12
<br />VT
<br />Pass
<br />JLS
<br />EXT = existing liner at previous termination
<br />4/23/03, Rev. 0
<br />G-6
<br />REVIEWED BY:
<br />'VT-VACCUM TEST
<br />SP - SPARK TEST
<br />AL - AIR LANCE
<br />Page 7 of 10
<br />
|