Laserfiche WebLink
117ECTOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION <br /> FIELD REPORT <br /> Project Name: Project No. <br /> Forward WMU FU-06 02.1605.07 Report Sequence <br /> Location of Work: Client Or Manager Date: 1 <br /> Stockton Day of The Week: <br /> Allied Waste May 15, 2006 Monday <br /> General Contractor: Liner Contractor: EEProject Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: <br /> In-place native soils High clouds, It. breeze SE, 680 0700 Mi Technician: <br /> Equipment on site: <br /> Mike Strobel <br /> 2x637 scrapers, D6 dozer, 815 compactor, water truck <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Contractor widens compost pad area; removing wet soils and replacing with drier material from cut on <br /> the east side of the compost pad. <br /> 2. Contractor starts construction of a ramp from the compost area to the top of FU-06 <br /> II. Testing <br /> ®1. None <br /> III. Conversations <br /> • Misc. discussion with Larry Simms w/Gwinn. <br /> • Brian Fritzler w/Vector, re: Get with Ryan Nelson w/Gwinn to coordinate sampling from a <br /> stockpile for a proposed clay borrow on `B" Street north of Arch Road. Expedite samples to the <br /> Vector Engineering, Inc. <br /> epared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev. 0 <br />