My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VC"TOR <br /> NGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. <br /> Forward WMU FU-06 02.1605.07 Report Sequence <br /> Location of Work: Client Or Manager Date: 2 <br /> Stockton Day of The Week: <br /> Allied Waste <br /> General Contractor: May 16,2006 Tuesda <br /> Liner May <br /> Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: <br /> 1In-place native soils CQA Technician: <br /> p Clear, breezy, 90°p.m. Mike Strobel <br /> Equipment on site: <br /> 2x637 scrapers, D6 dozer, 815 compactor, water truck <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued work on compost pad and ramp. <br /> II. Testing <br /> 1. None <br /> III. Conversations <br /> • None listed. <br /> Prepared B <br /> p y Reviewed By: �� <br /> 1 of 1 4/23/03,Rev.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.