"TOR <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 4 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste May 18, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> In-place native soils Clear,breezy (NW), 90's p.m. Michael Strobel <br /> Equipment on site: <br /> 2x637 scrapers, D6 dozer, 815 compactor,water truck, 12G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Start construction of temporary berms in the upper area of FU-06. Fill materials from the demolition of <br /> the existing berm along the east side of FU-05. Scrapers place and compact thin 4"-6" loose lifts. <br /> 2. Continued/finished work on compost pad and ramp. <br /> II. Testing <br /> 1. None <br /> III. Conversations <br /> • With Larry Simms, Gwinn Construction, re: Contractor will go to 10 hour days, Monday <br /> through Thursday, with Friday a short day. <br /> Prepared By: Reviewed By: <br /> I of 1 4/23/03,Rev.0 <br />