CT01 <br /> ENGINEERING, A <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. <br /> Forward WMU FU-06 02.1605.07 Report Sequence <br /> Location of Work: Client Or Manager Date: 13 <br /> Day of The Week: <br /> Stockton <br /> Allied Waste June 1, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: <br /> Stockpile, SWC FU-06 Bcmg. overcast, breezyP.M. NW, 60's to hi 80's M ke Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor,water truck, excavator,rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued construction of 4' fill on 5:1 area; at about 62' MSL this a.m. Material continues to be <br /> collected from the "wedge" in the SWC of FU-06. <br /> 2. Continued loading black topsoils from east of the compost pad to the French Camp Closure. <br /> II. Testing <br /> 1. Performed 9 FDT's, in compacted subgrade placed on the 5:1 slope; tests SG-26 through SG-33, <br /> including retest SG-26A in an area needing additional effort. After retesting, all test results indicate <br /> passing results. <br /> III. Conversations <br /> • Monte Christie, Vector engineer, re: Site visit. Check work in progress, test results to date. <br /> Helped set up computer and printer. <br /> o <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />