Laserfiche WebLink
17E TOW <br /> ENGINEERING, Ili <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. ReportSequence <br /> Forward WMU FU-06 02.1605.07 14 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 2, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: TCQ—A Technician: <br /> Stockpile, SWC FU-06 Scat clouds, breezy(N ), 60's tohi 80's ike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor,water truck, excavator,rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued/finished construction of 4' fill on 5:1 area. <br /> 2. Continued loading out black top-soils from east of the compost pad to the French Camp Closure. <br /> II. Testing <br /> ® 1. Performed 7 FDT's, in compacted subgrade placed on the 5:1 slope; tests SG-34 through SG-40. <br /> All tests indicate passing results. <br /> 2. Pounded+2%and +4% Proctor points on sample SG-3. Prepared+6%point for Monday, 6/5/06. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: OK <br /> 1 of 1 4/23/03,Rev. 0 <br />