My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1W Irv-1 <br /> VENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 16 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 6, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Import Clear a.m.-bcmg. ovrest .m.,lt. breeze (NW), low 90's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. The D6 dozer and 12G blade continued-finished minor trimming atop the fill placed on the 5:1 slope. <br /> 2. Continued loading out black top-soils from east of the compost pad to the French Camp Closure. <br /> 3. Contractor continued placing Subgrade fill on the east floor area of FU-06. <br /> 4. The "V" ditches for the LCRS piping have been cut into subgrade in the north area of FU-06. <br /> 10I. Testing <br /> 1. Performed 5 FDT's in compacted subgrade being placed in the east floor of FU-06; tests SG-48 <br /> through SG-52, including performing a Proctor check point with test CKPTSG-50. All tests passing. <br /> 2. Performed Liquid Limit on subgrade sample SG-1. <br /> 3. Completed Sieve Analysis on subgrade sample SG-3 with 58.9%minus 200 materials. <br /> 4. Collected Subgrade Proctor sample SGP-5. <br /> III. Conversations <br /> • With Larry Simms, Gwinn Construction, re: Discussed decreasing the moisture content in the <br /> subgrade fill material being placed in the east floor of FU-06. <br /> Prepared B Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.