Laserfiche WebLink
VE TOR <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 22 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 13, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Import Cloudy, reezy (W),high 50's to high 70's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator,rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> 1. Construction <br /> 1. Continued placement of Subgrade soils outside the side project area on the east side of FU-06. <br /> 2. Continued detail work atop FU-06; prepare to deploy geotextile. <br /> 3. Contractor continued butt-fusion welding the 3" diameter perforated HDPE LCRS pipes. <br /> II. Testing <br /> 0 1. Performed 3 FDT's in compacted Subgrade; tests SG-67 through SG-69. All tests passed. <br /> 2. Received truck load#5 with 30 rolls of 8 oz. geotextile. <br /> III. Conversations <br /> • None listed. <br /> ® Y <br /> Prepared B Reviewed By: <br /> P <br /> 1 of 1 4/23/03,Rev.0 <br />